Home > Knowledge > Content

What work needs to be done before the mobile hydraulic lifting platform is used?

Oct 10, 2022

Check before use:

1. Check whether the power cord and the control lines of each electric control box are in good condition.

2. Check whether the switches can be used normally and whether the buttons are flexible.

3. Check whether the oil pipeline is worn or leaked.

4. Check the welding place of the machine and whether the screws at the connection of each component are loose.

Start the device:

1. Open the support legs, adjust the outrigger bolts to keep the lifting platform level, and finally lock the positioning bolts.

2. Turn on the power and put the power cord in a safe place. After the indicator light is on, the empty machine test can be carried out.

3. When the elevator is working, it is necessary to prevent safety warning signs in conspicuous places.

Send Inquiry